| Mobile Web

AI data centres face power bottleneck, not servers; natural gas and electrical equipment stocks seen benefiting

The key variable in the race to build AI infrastructure is shifting from semiconductors and servers to securing electricity, as AI moves into large-scale operations. As AI data centres expand, the ability to deliver reliable power at the right place and time is becoming critical. Demand for natural gas is expected to rise, but multiple infrastructure steps are needed to turn gas into usable power. Developers also face permitting, grid connections and other bottlenecks.