| Mobile Web

Nvidia packs Vera Rubin AI factory into single container, cuts data centre build time from 6 months to 2 weeks

Nvidia on Tuesday unveiled DSX POD, a reference design it said can sharply reduce the time needed to build AI data centres. The system has partners assemble a modular container-based AI factory built on Nvidia’s Vera Rubin platform, with computing, networking, cabling, rack-level power and liquid cooling integrated and installed at a manufacturing plant. Nvidia said this can cut on-site build time from 6 months to as little as 14 days.