Ford has started producing lithium iron phosphate (LFP) batteries for its Fathom electric pickup truck at a Michigan plant.
InsideEVs reported on Nov. 18, local time, that Ford has begun manufacturing mass-production-grade LFP battery packs at BlueOval Battery Park Michigan in Marshall, Michigan, a few hours west of Detroit.
The batteries produced this time will first be installed in Fathom prototypes. Full-scale mass production is expected to begin next year. For Ford, it marked a turning point in bringing the battery supply chain into the United States alongside development of a new electric pickup.
The plant was presented as the first case in the United States of local production of LFP batteries used in vehicles for mass-market consumers. LG Energy Solution also produces LFP batteries in the United States, but its supply is for stationary energy storage systems for GM and Tesla. Ford’s 2 million-square-foot facility is dedicated to automotive LFP batteries.
Production capacity was also spelled out. Annual capacity is 20 gigawatt-hours, and the plant can make 50 battery packs per hour. It has a vertically integrated structure in which finished battery packs come out after lithium and iron phosphate powder are fed in. Key processes, including production of anode and cathode materials, are carried out inside the plant.
Ford sees the plant as a core facility directly tied to the Fathom launch schedule. Allan Clarke (앨런 클라크), vice president of Ford Advanced Development Projects, said at a media briefing, "Ford is moving quickly to launch the Fathom." He said Ford built a new universal EV platform, a new production system at the Louisville assembly plant and a U.S. LFP battery production system in a short period. He said building a battery plant, a unicastings plant and a highly automated vehicle production facility in less than five years is faster than the pace in China.
A licensing deal with China’s CATL underpins the plant’s technology. Ford established the production system by adopting CATL’s battery technology. Ford owns and operates the plant, while CATL engineers supported setup of complex production equipment, worker training and establishment of a quality-control system. Ford explained that the prismatic LFP cells for the Fathom are Ford-specific specifications, not CATL’s existing global product lineup.
Ford said the plant also meets requirements under the Inflation Reduction Act (IRA). It said raw materials used for battery production are not sourced from entities designated by the U.S. government as a foreign entity of concern. It said that while the technology came from CATL, the core materials are structured not to rely on sources of concern to the United States such as China, Russia and North Korea.
Meng Wang (멍 왕), head of battery cell industrialisation and chief engineer at Ford, said of the background to cooperation with CATL, "To reduce time to market, we decided to learn from a top-tier partner." He added that CATL transferred key knowledge to Ford, including equipment functions, manufacturing processes and quality control.
A future timeline was also laid out. Fathom preorders will begin in early 2027, and production and deliveries are expected to begin by the end of next year. Ford will therefore put to the test both commercialisation of an electric pickup backed by lower-cost batteries and localisation of battery production in the United States.